John Breed, Diary and Training diary, item 104
Transcription
Transcription history
-
must be taken before commencing to screw in, to hold
the breech screw "Square" against the face of the carrier
with one of the threaded portions of the screw upper
most, the stamping on the screw being to the rear. Two
and one quarter turns of the breech screw are required
in screwing in, the retaining catch being pressed in
clear of the screw during this operation
When inserting the trigger, first correctly assemble the
spring with the projecting ends in the holes for their
reception in the Part I trigger and bush, then insert
the collar on the trigger with the recessed portion inner
most and twist the bush on the trigger until the projection
on it engages with the recess in the collar. Insert Part I
trigger with bush, collar, and spring into the left side
of the gun and engage with "Part II" trigger inserted
from the rear. Insert keep pin
Description
Save descriptionLocation(s)
- ID
- 17035 / 198343
- Contributor
- Mrs Jean Hanby
Login to edit the languages
Login to edit the fronts
- Western Front
Login to add keywords
- Artillery
- Trench Life

































































































































































Login to leave a note