WAR DIARY

Place | Date | Hour | Summary of Events and Information


In the Field | 1.5.17 | The 2nd Army Commander inspected the Clapham Junction Bruloose Line with its

branches, the line having been completed by April 30   the date specified.

5.5.17 | Leaving No. 1 platoon at Clapham Junction to maintain the now completed line,

the headquarters and Nos. 2 and 4 platoons moved by rail to Sheet 28 G.11.B.88

where they were joined by No. 3 platoon.

8.5.17 | Work on alterations to Pacific Sidings and EDWAART HOEK begun

9.5.17 | Work on the construction of WESTONHOEK TRANSHIPPING YARD was begun

11.5.17 | "   "   "   " OFFLOADING PLATFORMS at GODWAERSVELDE was begun.

18.5.17 | Above platforms were completed.

An overland Summer Loco Water Supply was begun, the section from INTERNATIONAL

CORNER to POPERINGHE being undertaken by the 262nd Coy.  company  RF

1.5.17 to 31.5.17 | Maintenance parties, increasing in size towards the end of the month, were

provided by the company, for work in the area round Ypres. The first casualties

to men of the unit occurred on May 12th. Two men were wounded by

shrapnel on that day near the YPRES ASYLUM. 

Transcription saved

WAR DIARY

Place | Date | Hour | Summary of Events and Information


In the Field | 1.5.17 | The 2nd Army Commander inspected the Clapham Junction Bruloose Line with its

branches, the line having been completed by April 30   the date specified.

5.5.17 | Leaving No. 1 platoon at Clapham Junction to maintain the now completed line,

the headquarters and Nos. 2 and 4 platoons moved by rail to Sheet 28 G.11.B.88

where they were joined by No. 3 platoon.

8.5.17 | Work on alterations to Pacific Sidings and EDWAART HOEK begun

9.5.17 | Work on the construction of WESTONHOEK TRANSHIPPING YARD was begun

11.5.17 | "   "   "   " OFFLOADING PLATFORMS at GODWAERSVELDE was begun.

18.5.17 | Above platforms were completed.

An overland Summer Loco Water Supply was begun, the section from INTERNATIONAL

CORNER to POPERINGHE being undertaken by the 262nd Coy.  company  RF

1.5.17 to 31.5.17 | Maintenance parties, increasing in size towards the end of the month, were

provided by the company, for work in the area round Ypres. The first casualties

to men of the unit occurred on May 12th. Two men were wounded by

shrapnel on that day near the YPRES ASYLUM. 


Transcription history
  • January 20, 2018 01:03:56 Thomas A. Lingner

    WAR DIARY

    Place | Date | Hour | Summary of Events and Information


    In the Field | 1.5.17 | The 2nd Army Commander inspected the Clapham Junction Bruloose Line with its

    branches, the line having been completed by April 30   the date specified.

    5.5.17 | Leaving No. 1 platoon at Clapham Junction to maintain the now completed line,

    the headquarters and Nos. 2 and 4 platoons moved by rail to Sheet 28 G.11.B.88

    where they were joined by No. 3 platoon.

    8.5.17 | Work on alterations to Pacific Sidings and EDWAART HOEK begun

    9.5.17 | Work on the construction of WESTONHOEK TRANSHIPPING YARD was begun

    11.5.17 | "   "   "   " OFFLOADING PLATFORMS at GODWAERSVELDE was begun.

    18.5.17 | Above platforms were completed.

    An overland Summer Loco Water Supply was begun, the section from INTERNATIONAL

    CORNER to POPERINGHE being undertaken by the 262nd Coy.  company  RF

    1.5.17 to 31.5.17 | Maintenance parties, increasing in size towards the end of the month, were

    provided by the company, for work in the area round Ypres. The first casualties

    to men of the unit occurred on May 12th. Two men were wounded by

    shrapnel on that day near the YPRES ASYLUM. 


Description

Save description
    Location(s)
    Login and add location


    ID
    4288 / 50904
    Source
    http://europeana1914-1918.eu/...
    Contributor
    Russell Turner
    License
    http://creativecommons.org/licenses/by-sa/3.0/


    May 1, 1917 – May 31, 1917
    Login to edit the languages
    • English

    Login to edit the fronts
    • Western Front

    Login to add keywords
    • Recruitment and Conscription
    • Remembrance
    • Transport

    Login and add links

    Notes and questions

    Login to leave a note